Fuel Service
We Prioritize Your Fuel Service Needs From Day One
Whether it’s building ground ups, remodels/renovations, and tenant improvements throughout the greater United States, our team has worked with the biggest fuel service companies in the country.
But no matter the size of the project at hand, our team has the experience to foresee problems that may arise – and make adjustments to avoid as many issues as possible. This is important because in Fuel Service construction, each project contains its own unique needs.
Using Experience to Deliver the Best Services
The construction industry is always changing. Construction pros have to stay on top of the current trends in order to adapt and stay on top of all the technological advancements. As a general contractor, we work hard to make sure each project exceeds our client’s expectations.
During the process, change orders happen. Our team makes sure we screen each one properly to verify it before confirming the details of the job and the pricing with the client.
We’re at our best when we partner with you. Our team provides the support and services needed to accomplish your objectives. We are continually hiring, developing, and applying new talents and technologies as our clients’ business needs change.
Typical Jobs Performed
- New construction
- Additions
- Interior build out
- Rollout programs
- Open and closed store remodels
- Rebranding/Reimaging programs
- Site surveys
- Store preservation programs
- Fixture installation
- Consulting
Give us a call to discuss your organization’s specific needs.
Fuel Service Projects
Love’s Travel Stop, Tolleson AZ
Renovation of existing Tire Shop and addition of new building
Specifications
Provided new concrete footers, concrete slab, steel structure, metal panel system building. Exterior had new Nitchia panels
Details
- Demo of one existing 35ft oil change bay in existing Tire Shop area
- Addition of two new oil change bays in existing Tire Shop area – one to be 75ft long and the other to be 35ft long
- New 54’ x 90’ metal building (total of 3,800 SF) addition to existing structure
- Added new concrete footers and concrete slab for new building
- Added new concrete apron around new structure
- Entire structure – both old and new painted to match.
- New building had new MEP system installed and connected to existing infra structure
Additional Comments
- Total timeline/schedule; 7 months
- Work was completed while station stayed open
Love’s Travel Stop, Aurora NE
Full renovation of the Shower Rooms
Specifications
Tile renovations in showers
Details
- Complete demo of (5) shower areas – totally 560sf
- Refloat of existing floors in shower area
- Re tile all floors and walls
- Re tile corridor floor
- Repaint ceilings
- Repaint all door frames
- Install new FRP Wall Panels
Additional Comments
- We were called into correct this project after another contractor was terminated
Love’s Travel Stop North Platte NE
Full renovation of the Shower Rooms
Specifications
Tile renovations in showers
Details
- Complete demo of (5) shower areas – totally 560sf
- Refloat of existing floors in shower area
- Re tile all floors and walls
- Re tile corridor floor
- Repaint ceilings
- Repaint all door frames
- Install new FRP Wall Panels
Additional Comments
- We were called into correct this project after another contractor was terminated
Where Your Vision Takes Shape Now
Tell us about your vision, projects, and ongoing needs, and we’ll show you the solutions we can provide.
Main Office:
(678) 880-4777
201 Gateway Dr
Canton GA 30115